Remove hydrogen and slag from your aluminum melt inline — before it becomes scrap. The FDUII-30 fixed-box dual-rotor degassing unit is installed directly in the melt transfer line between the melting/holding furnace and the casting table, treating 25–35 tons of aluminum per hour continuously. With two variable-speed graphite rotors (0–600 rpm) dispersing high-purity nitrogen or argon into fine bubbles, the unit guarantees ≥ 56% hydrogen removal: melt entering above 0.28 mL/100g leaves at no more than 0.14 mL/100g — the difference between sound billet and porous, cracked extrusion billet.
Typical applications: billet casting lines (homogenizing-ready quality), slab/ingot casting, melt quality upgrades for extrusion and rolling plants, and foundries supplying automotive and aerospace-grade aluminum.
Degassing performance is where most suppliers go vague. Ours is written into the acceptance test: measured with a hydrogen density analyzer (e.g. Reduced Pressure Test or quantitative analyzer) at the inlet and outlet of the box, under 100% melt coverage.
| Inlet Hydrogen Content (mL/100g) | Guaranteed Outlet (mL/100g) | Removal Efficiency |
|---|---|---|
| > 0.28 | ≤ 0.14 | ≥ 56%* |
| ≤ 0.28 | ≤ 0.12 | — |
*Efficiency ≥56% is the contractual guarantee under standard working conditions (N₂ purity ≥99.996%, rotor 0–600 rpm VFD, melt 680–770°C).
Why it matters: every 0.1 mL/100g of residual hydrogen in billet means blister, delamination and cracks during extrusion or heat treatment. Inline degassing at the transfer launders catches the hydrogen introduced by melting scrap and transfer — before it is locked into your casting.
| No. | Item | Specification |
|---|---|---|
| 1 | Model | FDUII-30 fixed box type, dual rotor |
| 2 | Aluminum processing capacity | 25–35 t/h |
| 3 | Box capacity | 1600 ± 100 kg |
| 4 | Max. melt depth in box | 750 mm |
| 5 | Working gas (N₂ or Ar) | Purity ≥ 99.996%, dew point < −69°C, H₂O ≤ 2 ppm, O₂ ≤ 3 ppm |
| 6 | Working gas pressure | 0.4–0.6 MPa |
| 7 | Working gas flow | 1.0–3 m³/h × 2 (per rotor) |
| 8 | Protective gas pressure | 0.1–0.3 MPa |
| 9 | Protective gas flow | 0.5–1.0 m³/h |
| 10 | Melt temperature range | 680–770°C |
| 11 | Outer shell temperature rise | ≤ 50°C (excluding top cover area, interfaces, inlet/outlet, residual Al outlet) |
| 12 | Max. furnace (heater) temperature | 1000°C, automatic control |
| 13 | Temperature control accuracy | ± 2°C |
| 14 | Power supply | Main: 380V / 50Hz / 3-phase; control: 220V / 50Hz |
| 15 | Heating method | Immersion heating, SCR thyristor control |
| 16 | Heating elements | U-shaped silicon carbide (SiC) rods × 4 |
| 17 | Rated heating power | 4 × 15 kW |
| 18 | Heating rate | With melt ≥ 20°C/h; without melt ≥ 40°C/h |
| 19 | Rotor motor | 0.75 kW × 2 |
| 20 | Rotor speed | 0–600 rpm, variable frequency |
| 21 | Rotor material | Composite graphite, shaft Ø90 × 900 mm, impeller Ø180 × 45 mm |
| 22 | Rotor immersion depth | 600–700 mm |
| 23 | Lifting & rotating | Hydraulic push-rod lifting; hydraulic slewing 0–180° (90° left/right) for maintenance |
| 24 | Degassing efficiency | ≥ 56% (see Hydrogen Removal Performance table) |
Maintenance without stopping the line. The box cover, heater and rotor mechanism lift hydraulically and swing 0–180° on a slewing bearing — rotor or SiC rod replacement takes minutes, with guide-rail protection and multi-point limit interlocks for safe operation.
It is guaranteed in the acceptance test: if melt enters the box above 0.28 mL/100g, outlet is ≤0.14 mL/100g; if inlet is already below 0.28 mL/100g, outlet is ≤0.12 mL/100g. Both figures assume N₂ purity ≥99.996% (dew point below −69°C) and melt at 680–770°C. For critical grades (e.g. aerospace billet), argon as working gas and a lower casting rate can push outlet levels further down — tell us your alloy and target, and we will confirm achievable values.
Contract-guaranteed service life: composite graphite rotors ≥1 month, SiC heating rods ≥1 month, heater sleeves ≥1 month; the box and cover linings last ≥12 months. The cover/rotor/heater assembly lifts hydraulically and swings up to 180° — replacement is done during a scheduled cast change (the idle pipeline keeps rotors clear between casts), not mid-cast.
Yes. The FDUII-30 connects inline via launders at 25–35 t/h and requires: a N₂ (or Ar) supply at ≥99.996% purity with dew point <−69°C, 0.4–0.6 MPa working pressure, 2×(1.0–3) m³/h flow; and 380V/50Hz 3-phase power. Footprint and foundation drawings are provided with the offer — send us your line layout and we will return an installation proposal.
Send us your alloy, casting rate and current hydrogen levels — our engineer will reply with a matched degassing configuration, gas consumption estimate and layout proposal within 24 hours.