Good price  online

products details

Home > Products >
Regenerative Burner System
>
PLC Control Regenerative Burner Combustion System Touch Screen Regenerative Burners For Aluminum Melting Furnace

PLC Control Regenerative Burner Combustion System Touch Screen Regenerative Burners For Aluminum Melting Furnace

Brand Name: Bolv
Model Number: 20T
MOQ: 1 set
Price: USD 20,000
Packaging Details: Standard export packaging (carbon box, pallet, film)
Detail Information
Place of Origin:
China
Fuel:
Heavy Oil, Diesel, Coal Tar, Liquefied Petroleum Gas, Natural Gas
Applicable Furnace Tonnage:
5-60 Tons
Exhaust Gas Temperature:
<150℃
Aluminum Melting Speed:
2-4 Tons/hour
Energy Consumption:
25-65 Kg/ton Of Aluminum
Control:
PLC
Application:
Aluminum Ingot Or/ And Billet Casting, Aluminum Liquid Transfer
Supply Ability:
100 sets/ year
Highlight:

PLC Control Regenerative Burner Combustion System

,

Touch Screen Regenerative Burners

,

PLC Control Regenerative Burners

Product Description

PLC control regenerative burning system for aluminum melting furnace

Regenerative combustion system is automatic operated by PLC, a multicolour touch screen displays aluminium temperature, furnace chamber temperature & regenerative bed air exhaustion temperature digitally.

 

Temperature of the flue gas exhausted through regenerative burner is lower than 200℃, flue gas which is less than 10% is exhausted from the bypass flue which is for furnace pressure controlling, the sum discharge temperature is lower than 250℃.

 

Ignites with natural gas.

Compressive air pressure is 4-6kg/cm2, consumption is 35m3/min.

 

Main power supply is 380V, 50Hz.

 

 

FAQ

1. What are the key points of daily inspection?
Temperature/furnace pressure, gas pressure/combustion status, furnace lining/sealing, degassing system, cooling water.

 

2. What is the regular maintenance cycle?
Daily: Clean the slag from the furnace mouth/flow channel; inspect the burner, ignition system, and seals.
Weekly: verify thermocouples/temperature control instruments; clean the scale in the water gap of the crystallizer; check the integrity of the filter plate.
Monthly: Conduct a comprehensive inspection of the lining thickness/cracks; calibrate the casting speed and traction synchronization; replace aged sealing rings/gaskets.
Every year: overhaul the furnace body (repair/reline the furnace lining); conduct a comprehensive inspection and maintenance of the casting machinery and electronic control system.

3. Safety precautions?
High temperature protection: Wear high temperature resistant clothing, protective face masks, and heat-insulating gloves to avoid burns.
Explosion protection: Leakage is strictly prohibited in gas furnaces, and regular leak detection is required; moist materials are prohibited inside the furnace to prevent explosions caused by water encountering aluminum liquid.
Emergency response: Equip with dry powder fire extinguishers and dry sand.