Good price  online

products details

Home > Products >
Aluminum Melting Furnace
>
Brick Structure Aluminum Melting Machine 20T Aluminium Scrap Melting Furnace

Brick Structure Aluminum Melting Machine 20T Aluminium Scrap Melting Furnace

Brand Name: Bolv
Model Number: 20T
MOQ: 1 set
Price: USD 120,000
Packaging Details: Standard export packaging (carbon box, pallet, film)
Payment Terms: T/T,L/C
Detail Information
Place of Origin:
China
Name:
Aluminum Melting Machine
Tonnage:
20T
Maximum Scrap Loading:
22T
Burner Type:
Regenerative Burner
Fuel:
Natural Gas 8400kcal/m³
Melting Period Fuelconsumption:
65 M³ /ton Of Aluminum (continuous Working To Melt The Scrap To 710℃
Maximum Natrual Gas Consumption:
Maximum 350N M³/hour (quick Melting Period)
Burner Load Adjustment:
PLC Adjustment
Scrap Type:
Loose Or Baled Aluminum Scrap, UBC, Automobile Engine
Supply Ability:
20 sets/ year
Highlight:

Brick Structure Aluminum Melting Machine

,

Aluminum Melting Machine 20T

,

20T Aluminium Scrap Melting Furnace

Product Description
Brick Structure Aluminum Melting Machine 20T Aluminium Scrap Melting Furnace
Brick structure aluminum scrap melting furnace for sale
Supply Scope of Melting Furnace Body
  • Furnace body steel structure: 1 set
  • Welding type furnace door: 1 pc
  • Furnace electric lifting mechanism: 1 set
  • Furnace lining: bricks: 1 set
  • Refractory combustion & PLC electric control system: 1 set
  • Spout block & draining device: 1 set
What are the advantages and disadvantages of using refractory bricks to build a natural gas melting furnace compared to a full fiber casting furnace?
Advantages:
  • Corundum refractory bricks are resistant to high temperature and aluminum liquid erosion. The furnace lining life can reach 12-18 months under long-term working conditions above 750 ℃, far exceeding the fiber lining life of 3-6 months
  • Anti erosion, anti cold and hot shock, frequent feeding and intermittent production are not easy to shed or leak aluminum
  • Strong heat storage capacity, slow temperature drop after shutdown, and lower energy consumption for continuous production
  • Repairing partial damage only requires individual brick replacement, without the need for overall rebuilding, resulting in lower repair costs
Shortcoming:
  • The furnace body has a huge self weight, and the foundation of the factory building needs to be reinforced
  • Long drying cycle (3-5 days)
  • The initial masonry cost is higher than that of the fiber furnace
  • The heating rate is slightly slower
Suitable for large tonnage aluminum melting furnaces, high amount of recycled materials, and long-term 24-hour continuous casting production lines.