Brick Structure Aluminum Melting Machine 20T Aluminium Scrap Melting Furnace

Brick Structure Aluminum Melting Machine 20T Aluminium Scrap Melting Furnace

Brand Name: Bolv
Model Number: 20T
MOQ: 1 set
Price: USD 120,000
Packaging Details: Standard export packaging (carbon box, pallet, film)
Payment Terms: T/T,L/C
Detail Information
Place of Origin:
China
Name:
Aluminum Melting Machine
Tonnage:
20T
Maximum Scrap Loading:
22T
Burner Type:
Regenerative Burner
Fuel:
Natural Gas 8400kcal/m³
Melting Period Fuelconsumption:
65 M³ /ton Of Aluminum (continuous Working To Melt The Scrap To 710℃
Maximum Natrual Gas Consumption:
Maximum 350N M³/hour (quick Melting Period)
Burner Load Adjustment:
PLC Adjustment
Scrap Type:
Loose Or Baled Aluminum Scrap, UBC, Automobile Engine
Supply Ability:
20 sets/ year
Highlight:

Brick Structure Aluminum Melting Machine

,

Aluminum Melting Machine 20T

,

20T Aluminium Scrap Melting Furnace

Product Description

Brick structure aluminum scrap melting furnace for sale 

 

Supply Scope of Melting Furnace Body 

Furnace body steel structure: 1 set

Welding type furnace door: 1 pc

Furnace electric lifting mechanism: 1 set

Furnace lining: bricks: 1 set

Refractory combustion & PLC electric control system: 1 set

Spout block & draining device:  1 set

 

FAQ

What are the advantages and disadvantages of using refractory bricks to build a natural gas melting furnace compared to a full fiber casting furnace?

Advantages:
① Corundum refractory bricks are resistant to high temperature and aluminum liquid erosion. The furnace lining life can reach 12-18 months under long-term working conditions above 750 ℃, far exceeding the fiber lining life of 3-6 months;
② Anti erosion, anti cold and hot shock, frequent feeding and intermittent production are not easy to shed or leak aluminum;
③ Strong heat storage capacity, slow temperature drop after shutdown, and lower energy consumption for continuous production;
④ Repairing partial damage only requires individual brick replacement, without the need for overall rebuilding, resulting in lower repair costs.
 
Shortcoming: The furnace body has a huge self weight, and the foundation of the factory building needs to be reinforced; Long drying cycle (3-5 days); The initial masonry cost is higher than that of the fiber furnace; The heating rate is slightly slower. Suitable for large tonnage aluminum melting furnaces, high amount of recycled materials, and long-term 24-hour continuous casting production lines.